The Library has been noisy with exciting sounds of construction!
The photo on the left shows the interior of the new addition, if you are standing at what will be the front door. The elevator shaft is on the left-hand side of the photograph. The right-hand photograph was taken while standing just beyond the elevator shaft looking back at the new entrance.


The roofers have been working today preparing the stacks roof (on the existing building) to be joined to the new addition. With this splendid early spring weather, the Blane Casey crew expects to break through the stacks roof tomorrow to start connecting the new addition to our Carnegie structure!